News

Project features New construction project on a beautiful wooded site fronting Highway 530 (near Highway 30):  10,475 sq. ft. surface on ground with possibility of a mezzanine 22 feet minimal clearance One 14’ x 14’ and one 8’ x 9’ garage door with loading dock Main electrical entrance of 200 Amp., 347/600 Volts Two restrooms, ceiling

Project features New industrial semi-detached including these following items : 22 feet minimal clearance with possibility of a mezzanine 14’ x 14’ garage door for each semi-detached and one 8’ x 9’ additionnal door for the 6,490 sq. ft. including a loading dock Main electrical entrance of 100 Amp., 347/600 Volts for each unit Standard

Formation à venir

Wednesday, 08 October 2014

Le 28 avril dernier, le Centre local de développement (CLD) Beauharnois-Salaberry avait convié trente démarcheurs internationaux d’Investissement Québec provenant des bureaux d’Amérique du Nord (Atlanta, Chicago, Los Angeles, Montréal et New York), d’Asie (Beijing, Mumbai, Seoul, Tokyo) et d’Europe (Londres, Munich, Paris, Stockholm) à venir constater par eux-mêmes, sur le terrain, chez-nous dans Beauharnois-Salaberry, l’effervescence

Réunis à Les Cèdres, à la jonction de l’autoroute 30 et du Corridor de commerce Ontario-Québec, les représentants des Centres locaux de développement (CLD) et des Municipalités régionales de comté (MRC) de Vaudreuil-Soulanges et de Beauharnois-Salaberry ont demandé aux candidats des élections provinciales du Suroît de se positionner quant à la reconnaissance du Pôle logistique

Page 1 / 212
TOP